Urban Project: Mina Al Arab - Bermuda 

BERMUDA - MINA AL ARAB

Position: Design Architect - Company: Al Bonian Consultant Engineers

Project Description:

 

Mina Al Arab is a Six distinct districts celebrate nature, each with its own character and inviting atmosphere to define Mina Al Arab as a desirable destination. With world-class amenities and hotels designed to offer a wide range of activities such as watersports, shopping and playgrounds to bring the communities together.

The Bermuda villas have been designed to optimize the extraordinary beachfront setting and sea views, and the modern styling gives the villas a spacious expansive feel. The reception opens into a large living and dining area, the interiors are distinctly modern and the rooms consist of quality fittings designed especially to accommodate the luxurious finishing that merges beautifully with the outdoor areas.

Project: Bermuda - 156 villas at Mina Al Arab - RAK
Client: RAK Properties
Contractor: Al Taameer Construction Group
Value: AED144,900,000

My Role & Tasks accomplished in Bermuda Project:

  • Coordinating with other project discipline engineers.

  • ​Propose improved solutions on technical issues on site

  • Conduct design and site coordination meetings

  • ​Ensure coordination among various departments like MEP, Structural and sub-consultant.

  • Advising contractors on the interpretation of plans and specifications, approving minor design changes in the course of construction.

  • Participates in the coordination and monitoring of snagging and project handover.

  • Arrange with drafting team to update any modifications required in the drawings.

  • Review and Approve site drawings submitted from contractor.

  • Attending site inspections.

  • Shortlist sample selection and prepare sample boards for Client's selection.